• Construction of two bridges.
  • Construction of a 500-tonne water reservoir.
  • Replacement of the community’s irrigation network.
  • Creation of two parks.
  • Installation of lighting at the square of the village.
  • Construction of a futsal pitch.
  • Repair of all rural roads.
  • Asphalting of roads throughout the community.
  • Construction of pavements.
  • Beautification of the river with stone.
  • Use of “cabio” – material used for retaining on the river banks.
  • Construction of two enriching “cabios” that will serve the irrigational needs of agricultural land expanses.
  • Renovation of three old wells which used to irrigate the community.
  • Naming of the village’s streets with names of the fallen, missing persons and heroes of 1955, as well as with names of occupied villages.
  • Installation of street lighting
  • Recycling of the old summer water, as well as the new summer water of Kourkousa which flows through the underground channels.